GDP Deployment Notes

BWRC Server Room

Sensors and Gateways
BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
Rear Wall BLEE - C0:98:E5:30:00:36
Mid Wall BLEE - C0:98:E5:30:00:5D
Hot Aisle BLEE- C0:98:E5:30:00:54
BLINK - C0:98:E5:90:00:1E
Lab Rear Wall BLEE - C0:98:E5:30:00:09
Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
Power Blade - Utility power to Air Compressor - C0:98:E5:70:90
USB Microphone - mounted on BBB

Operational Notes
6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.

7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker.

7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.

Cory Hall Swarm Lab and Immersion Room

Servers and Sensors
Immersion Room
Primary projector PowerBlade C0:98:E5:70:00:2B
Secondary projector PowerBlade C0:98:E5:70:00:8B
Speaker Camera PowerBlade C0:98:E5:70:00:8E
Audience Camera PowerBlade C0:98:E5:70:00:88
BLEE, rear camera pillar C0:98:E5:30:00:03
Front wall adjacent to screen Blink C0:98:E5:90:00:0A
UHKBBB001.eecs.berkeley.edu 128.32.33.236

Operational Notes
7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected.
Note that accumulated energy goes to zero at this time.
7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM

Jacobs Hall

Gateways
ML-100 - swarmnuc1005.eecs.berkeley.edu
BBB - uhkbbb005.eecs.berkeley.edu

Powerblades
c0:98:e5:70:00:8a Carbon 3D printer room 332
c0:98:e5:70:00:e2
c0:98:e5:70:00:e5
c0:98:e5:70:00:d3
c0:98:e5:70:00:d7
c0:98:e5:70:00:f7
c0:98:e5:70:00:db - Type A 3D printer 10094 room 110

c0:98:e5:70:01:13
c0:98:e5:70:01:22
c0:98:e5:70:01:23
c0:98:e5:70:01:25
c0:98:e5:70:01:26
c0:98:e5:70:01:27
c0:98:e5:70:01:29
c0:98:e5:70:01:0c
c0:98:e5:70:01:2e
c0:98:e5:70:01:31

BLEE
c0:98:e5:30:00:2f
c0:98:e5:30:00:55 room 120
c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
c0:98:e5:30:00:57 room 110 by thermostst
c0:98:e5:30:00:62 room 10C Woodshop
c0:98:e5:30:00:51 room 332 center of room

Blink
c0:98:e5:90:00:17
c0:98:e5:90:00:86
c0:98:e5:90:00:94
c0:98:e5:90:00:96
c0:98:e5:90:00:85 room 332
c0:98:e5:90:00:87
c0:98:e5:90:00:81 - wood shop room 10C

Operational Notes
Sensors installed, new batteries 7/15/16