# GDP Deployment Notes
2 1 Ken Lutz
3 16 Ken Lutz
## Data users email list created
4 15 Ken Lutz
If you would like to be notified of data anomalies or changes in the sensor actuator send an email to lutz@berkeley.edu asking to be added to the email list, swarm-gdp-data-users@lists.eecs.berkeley.edu
5 15 Ken Lutz
6 13 Nitesh Mor
**log naming convention:** Unless otherwise noted, the name of the corresponding logs are derived from the physical location (currently `bwrc` or `swarmlab`) and the lowercase MAC address:
7 13 Nitesh Mor
8 13 Nitesh Mor
    edu.berkeley.eecs.<location>.device.<mac-addr>
9 13 Nitesh Mor
10 13 Nitesh Mor
For example, a sensor with MAC address `C0:98:E5:30:00:03` in the immersion room (which is in swarmlab) will be named `edu.berkeley.eecs.swarmlab.device.c098e5300003`
11 13 Nitesh Mor
12 2 Ken Lutz
## BWRC Server Room
13 3 Ken Lutz
**Sensors and Gateways**
14 3 Ken Lutz
BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
15 3 Ken Lutz
Rear Wall BLEE - C0:98:E5:30:00:36 
16 3 Ken Lutz
Mid Wall BLEE - C0:98:E5:30:00:5D
17 3 Ken Lutz
Hot Aisle BLEE- C0:98:E5:30:00:54
18 3 Ken Lutz
BLINK - C0:98:E5:90:00:1E
19 3 Ken Lutz
Lab Rear Wall BLEE - C0:98:E5:30:00:09
20 3 Ken Lutz
Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
21 34 Ken Lutz
Power Blade - Utility power to Air Compressor - C0:98:E5:70:00::90
22 3 Ken Lutz
USB Microphone - mounted on BBB
23 3 Ken Lutz
24 23 Ken Lutz
## BWRC Office Area
25 23 Ken Lutz
**Sensors and Gateways**
26 23 Ken Lutz
Swarmnuc1002.eecs.berkeley.edu
27 24 Ken Lutz
**BLEE**
28 23 Ken Lutz
Main seating area - C0:98:E5:30:00:A5
29 23 Ken Lutz
Conference Room , Rabaey Room - C0:98:E5:30:00:A3
30 23 Ken Lutz
Admin Office - C0:98:E5:30:00:A4
31 23 Ken Lutz
Conference Room - Brodersen room - C0:98:E5:30:00:A2
32 23 Ken Lutz
Ken's Office  - C0:98:E5:30:00:A1
33 23 Ken Lutz
Brian Office above thermostat - C0:98:E5:30:00:A0
34 1 Ken Lutz
Center of student seating area, above thermostat - C0:98:E5:30:00:37
35 24 Ken Lutz
**Blink**
36 24 Ken Lutz
  Brodersen Conference Room C0:98:E5:90:00:87
37 24 Ken Lutz
Rabaey Conference room -  C0:98:E5:30:00:94
38 23 Ken Lutz
39 23 Ken Lutz
40 2 Ken Lutz
**Operational Notes**
41 2 Ken Lutz
6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.
42 2 Ken Lutz
7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker. 
43 2 Ken Lutz
7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.
44 14 Nitesh Mor
7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway. 
45 17 Ken Lutz
7/19/16 - :BWRC BLEE, Lab Rear wall C0:98:E5:30:00:09
46 17 Ken Lutz
7/19/16 4:05 PM - 4:19PM
47 29 Ken Lutz
8/1/16 BBB004 down for maintenance 2-5pm.
48 17 Ken Lutz
49 17 Ken Lutz
Put a cover over the BLEE causing the light level to go to zero. Temp and humidity are down as well.
50 17 Ken Lutz
51 17 Ken Lutz
7/19/16 4:20PM - 4:31PM
52 17 Ken Lutz
BWRC  BLEE mid wall C0:98:E5:30:00:5D
53 17 Ken Lutz
54 17 Ken Lutz
Put a cover over BLEE in server room, mid wall. Light level goes to zero, temp goes up
55 17 Ken Lutz
Other sensors in the server room do not show similar readings
56 2 Ken Lutz
57 25 Ken Lutz
7/25/16 - Added sensors and gateway to BWRC office area. New batteries
58 36 Ken Lutz
8/8/2016 Replaced batteries in server room  and Kens office
59 36 Ken Lutz
8/8/16 Removed test powerblade from air compressor outlet strip
60 25 Ken Lutz
61 2 Ken Lutz
## Cory Hall Swarm Lab and Immersion Room
62 11 Ken Lutz
**Servers and Sensors**
63 33 Ken Lutz
**Immersion Room**
64 26 Ken Lutz
Primary projector PowerBlade ~~C0:98:E5:70:00:2B~~ C0:98:E5:70:00:8D
65 11 Ken Lutz
Secondary projector PowerBlade C0:98:E5:70:00:8B
66 11 Ken Lutz
Speaker Camera PowerBlade C0:98:E5:70:00:8E
67 11 Ken Lutz
Audience Camera PowerBlade C0:98:E5:70:00:88
68 11 Ken Lutz
BLEE, rear camera pillar C0:98:E5:30:00:03
69 11 Ken Lutz
Front wall adjacent to screen Blink C0:98:E5:90:00:0A
70 11 Ken Lutz
UHKBBB001.eecs.berkeley.edu 128.32.33.236
71 11 Ken Lutz
72 1 Ken Lutz
Chair BLEES C0:98:E5:30:0:  {58, 5c, 5F, 7a, 7b, 74, 75, 76, 77, 78}
73 33 Ken Lutz
74 33 Ken Lutz
**Entrance Lobby**
75 33 Ken Lutz
76 33 Ken Lutz
Swarm Lab Inside Entrance Lobby
77 34 Ken Lutz
Blink C0:98:E5:90:00:0B
78 33 Ken Lutz
BLEE C0:98:E5:30:00:0A
79 33 Ken Lutz
80 33 Ken Lutz
**Office 490B**
81 33 Ken Lutz
UHKBBB002.eecs.berkeley.edu
82 33 Ken Lutz
83 33 Ken Lutz
**4th floor Elevator Lobby**
84 33 Ken Lutz
Blink C0:98:E5:90:00:91
85 33 Ken Lutz
SwarmBox swarmnuc1020.eecs.berkeley.edu
86 33 Ken Lutz
87 33 Ken Lutz
**Exit Stair Door near 490**
88 33 Ken Lutz
Blink C0:98:E5:90:00:19
89 33 Ken Lutz
90 33 Ken Lutz
91 11 Ken Lutz
92 12 Ken Lutz
93 2 Ken Lutz
**Operational Notes**
94 2 Ken Lutz
7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected. 
95 2 Ken Lutz
Note that accumulated energy goes to zero at this time. 
96 2 Ken Lutz
7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
97 2 Ken Lutz
7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
98 2 Ken Lutz
7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
99 1 Ken Lutz
7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM
100 1 Ken Lutz
7/18/16 - 11:30AM BLEES installed on conference table chairs w/ new batteries
101 20 Nitesh Mor
7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway.
102 21 Nitesh Mor
7/19/16: Beaglebone gateway is got powered off. Last data collected was around 4:56PM. Restarted at 10:50PM
103 1 Ken Lutz
7/20/16: Rear Camera pillar BLEE - Battery replaced 3:26PM
104 26 Ken Lutz
7/26/16 Main projector power blade failed - replaced with new unit (new MAC)
105 29 Ken Lutz
8/1/16 BBB001 down for maintenance
106 35 Ken Lutz
8/8/16 Batteries replaced in all sensors except chairs
107 2 Ken Lutz
108 2 Ken Lutz
## Jacobs Hall
109 5 Ken Lutz
Gateways
110 31 Ken Lutz
~~ML-100 - swarmnuc1005.eecs.berkeley.edu B8:AE:ED:74:09:3D was port 10D-120C-03F10-D room 120~~
111 27 Ken Lutz
BBB - uhkbbb005.eecs.berkeley.edu port 10D-332-04F17-D Room 332
112 27 Ken Lutz
BBB uhkbbb006.eecs.berkeley.edu 54:4a:16:e0:8b:a1 10D-120C-03F10-D room 120
113 28 Ken Lutz
BBB uhkbbb007.eecs.berkeley.edu  6c:ec:eb:5c:64:5b Room 10 10D-10B-02f16-D
114 5 Ken Lutz
115 19 Ken Lutz
### Room 110
116 19 Ken Lutz
**Powerblades**
117 1 Ken Lutz
c0:98:e5:70:01:13 Type A 3D printer 10026	room 110
118 1 Ken Lutz
c0:98:e5:70:01:22
119 1 Ken Lutz
c0:98:e5:70:01:23 Type A 3D printer 10047	room 110
120 1 Ken Lutz
c0:98:e5:70:01:25
121 1 Ken Lutz
c0:98:e5:70:01:26 Laser 2                                room 110C
122 1 Ken Lutz
c0:98:e5:70:01:27 Type A 3D printer 10097	room 110
123 1 Ken Lutz
c0:98:e5:70:01:29 Type A 3D printer 10213	room 110
124 19 Ken Lutz
c0:98:e5:70:00:e2 Laser 1	                                room 110C
125 19 Ken Lutz
c0:98:e5:70:00:e5 Type A 3D printer 10035	room 110
126 19 Ken Lutz
c0:98:e5:70:00:d3 Type A 3D printer 10098	room 110
127 19 Ken Lutz
c0:98:e5:70:00:d7 Type A 3D printer 10025	room 110
128 19 Ken Lutz
c0:98:e5:70:00:f7 Type A 3D printer 10038	room 110
129 19 Ken Lutz
c0:98:e5:70:00:db - Type A 3D printer 10094 room 110
130 19 Ken Lutz
c0:98:e5:70:01:31 Type A 3D printer 10034	room 110	
131 19 Ken Lutz
**
132 19 Ken Lutz
BLEE**
133 1 Ken Lutz
c0:98:e5:30:00:57 room 110 by thermostst
134 34 Ken Lutz
c0:98:e5:30:00:55  check placement in room
135 19 Ken Lutz
136 34 Ken Lutz
137 19 Ken Lutz
### Room 332
138 19 Ken Lutz
139 19 Ken Lutz
**PowerBlades**
140 19 Ken Lutz
c0:98:e5:70:00:8a Carbon 3D printer              room 332
141 18 Ken Lutz
c0:98:e5:70:01:0c Dimension 2 (Bonnie)	room 332
142 1 Ken Lutz
c0:98:e5:70:01:2e Dimension 1 (Clyde)         room 332
143 4 Ken Lutz
144 19 Ken Lutz
**BLEE**
145 32 Ken Lutz
146 1 Ken Lutz
c0:98:e5:30:00:55 room 120
147 4 Ken Lutz
c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
148 4 Ken Lutz
c0:98:e5:30:00:51 room 332 center of room
149 7 Ken Lutz
150 19 Ken Lutz
**Blink**
151 19 Ken Lutz
c0:98:e5:90:00:85 room 332
152 19 Ken Lutz
153 32 Ken Lutz
154 32 Ken Lutz
155 4 Ken Lutz
c0:98:e5:90:00:94
156 32 Ken Lutz
157 19 Ken Lutz
158 4 Ken Lutz
c0:98:e5:90:00:87
159 19 Ken Lutz
160 1 Ken Lutz
### Room 10C
161 1 Ken Lutz
**Blink**
162 19 Ken Lutz
c0:98:e5:90:00:81 - wood shop room 10C
163 34 Ken Lutz
**BLEE**
164 34 Ken Lutz
c0:98:e5:30:00:62 room 10C Woodshop
165 4 Ken Lutz
166 4 Ken Lutz
167 2 Ken Lutz
**Operational Notes**
168 4 Ken Lutz
Sensors installed, new batteries 7/15/16
169 30 Eric Allman
170 37 Ken Lutz
### Unassigned BBB Ready for deployment
171 37 Ken Lutz
UHKBBB008.eecs.berkeley.edu  b0:d5:cc:83:0b:01
172 37 Ken Lutz
UHKBBB009.eecs.berkeley.edu  88:c2:55:83:6c:29
173 37 Ken Lutz
174 30 Eric Allman
175 30 Eric Allman
## Configuring Gateways
176 30 Eric Allman
177 30 Eric Allman
See [[Configuring Gateways]] for information about setting up gateway hosts (typically either BBBs or SwarmBoxes).