Project

General

Profile

Wiki » History » Version 38

Eric Allman, 08/23/2016 07:06 AM

1 1 Ken Lutz
# GDP Deployment Notes
2 1 Ken Lutz
3 16 Ken Lutz
## Data users email list created
4 15 Ken Lutz
If you would like to be notified of data anomalies or changes in the sensor actuator send an email to lutz@berkeley.edu asking to be added to the email list, swarm-gdp-data-users@lists.eecs.berkeley.edu
5 15 Ken Lutz
6 38 Eric Allman
## Conventions
7 38 Eric Allman
Unless otherwise noted, the name of the corresponding logs are derived from the physical location (currently `bwrc` or `swarmlab`) and the lowercase MAC address:
8 13 Nitesh Mor
9 13 Nitesh Mor
    edu.berkeley.eecs.<location>.device.<mac-addr>
10 13 Nitesh Mor
11 1 Ken Lutz
For example, a sensor with MAC address `C0:98:E5:30:00:03` in the immersion room (which is in swarmlab) will be named `edu.berkeley.eecs.swarmlab.device.c098e5300003`
12 1 Ken Lutz
13 38 Eric Allman
## Provisioning
14 38 Eric Allman
See [[Provisioning Sensors]] for instructions on how to add new sensors.
15 38 Eric Allman
16 38 Eric Allman
## Deployments
17 38 Eric Allman
18 38 Eric Allman
### BWRC Server Room
19 3 Ken Lutz
**Sensors and Gateways**
20 3 Ken Lutz
BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
21 3 Ken Lutz
Rear Wall BLEE - C0:98:E5:30:00:36 
22 3 Ken Lutz
Mid Wall BLEE - C0:98:E5:30:00:5D
23 3 Ken Lutz
Hot Aisle BLEE- C0:98:E5:30:00:54
24 3 Ken Lutz
BLINK - C0:98:E5:90:00:1E
25 3 Ken Lutz
Lab Rear Wall BLEE - C0:98:E5:30:00:09
26 34 Ken Lutz
Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
27 1 Ken Lutz
Power Blade - Utility power to Air Compressor - C0:98:E5:70:00::90
28 3 Ken Lutz
USB Microphone - mounted on BBB
29 3 Ken Lutz
30 38 Eric Allman
### BWRC Office Area
31 23 Ken Lutz
**Sensors and Gateways**
32 23 Ken Lutz
Swarmnuc1002.eecs.berkeley.edu
33 24 Ken Lutz
**BLEE**
34 23 Ken Lutz
Main seating area - C0:98:E5:30:00:A5
35 23 Ken Lutz
Conference Room , Rabaey Room - C0:98:E5:30:00:A3
36 23 Ken Lutz
Admin Office - C0:98:E5:30:00:A4
37 23 Ken Lutz
Conference Room - Brodersen room - C0:98:E5:30:00:A2
38 23 Ken Lutz
Ken's Office  - C0:98:E5:30:00:A1
39 23 Ken Lutz
Brian Office above thermostat - C0:98:E5:30:00:A0
40 1 Ken Lutz
Center of student seating area, above thermostat - C0:98:E5:30:00:37
41 24 Ken Lutz
**Blink**
42 24 Ken Lutz
  Brodersen Conference Room C0:98:E5:90:00:87
43 24 Ken Lutz
Rabaey Conference room -  C0:98:E5:30:00:94
44 23 Ken Lutz
45 23 Ken Lutz
46 2 Ken Lutz
**Operational Notes**
47 2 Ken Lutz
6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.
48 2 Ken Lutz
7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker. 
49 2 Ken Lutz
7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.
50 14 Nitesh Mor
7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway. 
51 17 Ken Lutz
7/19/16 - :BWRC BLEE, Lab Rear wall C0:98:E5:30:00:09
52 17 Ken Lutz
7/19/16 4:05 PM - 4:19PM
53 29 Ken Lutz
8/1/16 BBB004 down for maintenance 2-5pm.
54 17 Ken Lutz
55 17 Ken Lutz
Put a cover over the BLEE causing the light level to go to zero. Temp and humidity are down as well.
56 17 Ken Lutz
57 17 Ken Lutz
7/19/16 4:20PM - 4:31PM
58 17 Ken Lutz
BWRC  BLEE mid wall C0:98:E5:30:00:5D
59 17 Ken Lutz
60 2 Ken Lutz
Put a cover over BLEE in server room, mid wall. Light level goes to zero, temp goes up
61 25 Ken Lutz
Other sensors in the server room do not show similar readings
62 36 Ken Lutz
63 1 Ken Lutz
7/25/16 - Added sensors and gateway to BWRC office area. New batteries
64 1 Ken Lutz
8/8/2016 Replaced batteries in server room  and Kens office
65 1 Ken Lutz
8/8/16 Removed test powerblade from air compressor outlet strip
66 36 Ken Lutz
67 38 Eric Allman
### Cory Hall Swarm Lab and Immersion Room
68 2 Ken Lutz
**Servers and Sensors**
69 38 Eric Allman
70 38 Eric Allman
#### Immersion Room
71 11 Ken Lutz
Primary projector PowerBlade ~~C0:98:E5:70:00:2B~~ C0:98:E5:70:00:8D
72 11 Ken Lutz
Secondary projector PowerBlade C0:98:E5:70:00:8B
73 11 Ken Lutz
Speaker Camera PowerBlade C0:98:E5:70:00:8E
74 11 Ken Lutz
Audience Camera PowerBlade C0:98:E5:70:00:88
75 1 Ken Lutz
BLEE, rear camera pillar C0:98:E5:30:00:03
76 11 Ken Lutz
Front wall adjacent to screen Blink C0:98:E5:90:00:0A
77 1 Ken Lutz
UHKBBB001.eecs.berkeley.edu 128.32.33.236
78 33 Ken Lutz
79 33 Ken Lutz
Chair BLEES C0:98:E5:30:0:  {58, 5c, 5F, 7a, 7b, 74, 75, 76, 77, 78}
80 1 Ken Lutz
81 38 Eric Allman
#### Entrance Lobby
82 1 Ken Lutz
83 34 Ken Lutz
Swarm Lab Inside Entrance Lobby
84 33 Ken Lutz
Blink C0:98:E5:90:00:0B
85 1 Ken Lutz
BLEE C0:98:E5:30:00:0A
86 33 Ken Lutz
87 38 Eric Allman
#### Office 490B
88 33 Ken Lutz
UHKBBB002.eecs.berkeley.edu
89 33 Ken Lutz
90 38 Eric Allman
#### 4th floor Elevator Lobby
91 33 Ken Lutz
Blink C0:98:E5:90:00:91
92 33 Ken Lutz
SwarmBox swarmnuc1020.eecs.berkeley.edu
93 33 Ken Lutz
94 38 Eric Allman
#### Exit Stair Door near 490
95 33 Ken Lutz
Blink C0:98:E5:90:00:19
96 33 Ken Lutz
97 33 Ken Lutz
98 11 Ken Lutz
99 2 Ken Lutz
100 2 Ken Lutz
**Operational Notes**
101 2 Ken Lutz
7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected. 
102 2 Ken Lutz
Note that accumulated energy goes to zero at this time. 
103 2 Ken Lutz
7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
104 1 Ken Lutz
7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
105 1 Ken Lutz
7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
106 1 Ken Lutz
7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM
107 20 Nitesh Mor
7/18/16 - 11:30AM BLEES installed on conference table chairs w/ new batteries
108 21 Nitesh Mor
7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway.
109 1 Ken Lutz
7/19/16: Beaglebone gateway is got powered off. Last data collected was around 4:56PM. Restarted at 10:50PM
110 1 Ken Lutz
7/20/16: Rear Camera pillar BLEE - Battery replaced 3:26PM
111 26 Ken Lutz
7/26/16 Main projector power blade failed - replaced with new unit (new MAC)
112 29 Ken Lutz
8/1/16 BBB001 down for maintenance
113 35 Ken Lutz
8/8/16 Batteries replaced in all sensors except chairs
114 2 Ken Lutz
115 38 Eric Allman
### Jacobs Hall
116 38 Eric Allman
**Gateways**
117 31 Ken Lutz
~~ML-100 - swarmnuc1005.eecs.berkeley.edu B8:AE:ED:74:09:3D was port 10D-120C-03F10-D room 120~~
118 27 Ken Lutz
BBB - uhkbbb005.eecs.berkeley.edu port 10D-332-04F17-D Room 332
119 5 Ken Lutz
BBB uhkbbb006.eecs.berkeley.edu 54:4a:16:e0:8b:a1 10D-120C-03F10-D room 120
120 19 Ken Lutz
BBB uhkbbb007.eecs.berkeley.edu  6c:ec:eb:5c:64:5b Room 10 10D-10B-02f16-D
121 19 Ken Lutz
122 38 Eric Allman
#### Room 110
123 1 Ken Lutz
**Powerblades**
124 1 Ken Lutz
c0:98:e5:70:01:13 Type A 3D printer 10026	room 110
125 1 Ken Lutz
c0:98:e5:70:01:22
126 1 Ken Lutz
c0:98:e5:70:01:23 Type A 3D printer 10047	room 110
127 1 Ken Lutz
c0:98:e5:70:01:25
128 1 Ken Lutz
c0:98:e5:70:01:26 Laser 2                                room 110C
129 1 Ken Lutz
c0:98:e5:70:01:27 Type A 3D printer 10097	room 110
130 1 Ken Lutz
c0:98:e5:70:01:29 Type A 3D printer 10213	room 110
131 19 Ken Lutz
c0:98:e5:70:00:e2 Laser 1	                                room 110C
132 19 Ken Lutz
c0:98:e5:70:00:e5 Type A 3D printer 10035	room 110
133 19 Ken Lutz
c0:98:e5:70:00:d3 Type A 3D printer 10098	room 110
134 19 Ken Lutz
c0:98:e5:70:00:d7 Type A 3D printer 10025	room 110
135 19 Ken Lutz
c0:98:e5:70:00:f7 Type A 3D printer 10038	room 110
136 19 Ken Lutz
c0:98:e5:70:00:db - Type A 3D printer 10094 room 110
137 19 Ken Lutz
c0:98:e5:70:01:31 Type A 3D printer 10034	room 110	
138 38 Eric Allman
139 38 Eric Allman
**BLEE**
140 1 Ken Lutz
c0:98:e5:30:00:57 room 110 by thermostst
141 34 Ken Lutz
c0:98:e5:30:00:55  check placement in room
142 19 Ken Lutz
143 34 Ken Lutz
144 38 Eric Allman
#### Room 332
145 19 Ken Lutz
146 19 Ken Lutz
**PowerBlades**
147 18 Ken Lutz
c0:98:e5:70:00:8a Carbon 3D printer              room 332
148 1 Ken Lutz
c0:98:e5:70:01:0c Dimension 2 (Bonnie)	room 332
149 4 Ken Lutz
c0:98:e5:70:01:2e Dimension 1 (Clyde)         room 332
150 19 Ken Lutz
151 1 Ken Lutz
**BLEE**
152 32 Ken Lutz
153 1 Ken Lutz
c0:98:e5:30:00:55 room 120
154 4 Ken Lutz
c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
155 4 Ken Lutz
c0:98:e5:30:00:51 room 332 center of room
156 7 Ken Lutz
157 19 Ken Lutz
**Blink**
158 19 Ken Lutz
c0:98:e5:90:00:85 room 332
159 19 Ken Lutz
160 32 Ken Lutz
161 32 Ken Lutz
162 4 Ken Lutz
c0:98:e5:90:00:94
163 32 Ken Lutz
164 19 Ken Lutz
165 4 Ken Lutz
c0:98:e5:90:00:87
166 19 Ken Lutz
167 38 Eric Allman
#### Room 10C
168 1 Ken Lutz
**Blink**
169 19 Ken Lutz
c0:98:e5:90:00:81 - wood shop room 10C
170 34 Ken Lutz
**BLEE**
171 34 Ken Lutz
c0:98:e5:30:00:62 room 10C Woodshop
172 4 Ken Lutz
173 4 Ken Lutz
174 2 Ken Lutz
**Operational Notes**
175 4 Ken Lutz
Sensors installed, new batteries 7/15/16
176 30 Eric Allman
177 37 Ken Lutz
### Unassigned BBB Ready for deployment
178 37 Ken Lutz
UHKBBB008.eecs.berkeley.edu  b0:d5:cc:83:0b:01
179 37 Ken Lutz
UHKBBB009.eecs.berkeley.edu  88:c2:55:83:6c:29
180 37 Ken Lutz
181 30 Eric Allman
182 30 Eric Allman
## Configuring Gateways
183 30 Eric Allman
184 30 Eric Allman
See [[Configuring Gateways]] for information about setting up gateway hosts (typically either BBBs or SwarmBoxes).