# GDP Deployment Notes
4 1 Ken Lutz
5 16 Ken Lutz
## Data users email list created
6 15 Ken Lutz
If you would like to be notified of data anomalies or changes in the sensor actuator send an email to lutz@berkeley.edu asking to be added to the email list, swarm-gdp-data-users@lists.eecs.berkeley.edu
7 15 Ken Lutz
8 38 Eric Allman
## Conventions
9 38 Eric Allman
Unless otherwise noted, the name of the corresponding logs are derived from the physical location (currently `bwrc` or `swarmlab`) and the lowercase MAC address:
10 13 Nitesh Mor
11 13 Nitesh Mor
    edu.berkeley.eecs.<location>.device.<mac-addr>
12 13 Nitesh Mor
13 1 Ken Lutz
For example, a sensor with MAC address `C0:98:E5:30:00:03` in the immersion room (which is in swarmlab) will be named `edu.berkeley.eecs.swarmlab.device.c098e5300003`
14 1 Ken Lutz
15 38 Eric Allman
## Provisioning
16 38 Eric Allman
See [[Provisioning Sensors]] for instructions on how to add new sensors.
17 38 Eric Allman
18 39 Nitesh Mor
## Configuring Gateways
19 39 Nitesh Mor
See [[Configuring Gateways]] for information about setting up gateway hosts (typically either BBBs or SwarmBoxes).
20 39 Nitesh Mor
21 38 Eric Allman
## Deployments
22 38 Eric Allman
23 38 Eric Allman
### BWRC Server Room
24 3 Ken Lutz
**Sensors and Gateways**
25 3 Ken Lutz
BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
26 3 Ken Lutz
Rear Wall BLEE - C0:98:E5:30:00:36 
27 3 Ken Lutz
Mid Wall BLEE - C0:98:E5:30:00:5D
28 3 Ken Lutz
Hot Aisle BLEE- C0:98:E5:30:00:54
29 3 Ken Lutz
BLINK - C0:98:E5:90:00:1E
30 3 Ken Lutz
Lab Rear Wall BLEE - C0:98:E5:30:00:09
31 34 Ken Lutz
Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
32 1 Ken Lutz
Power Blade - Utility power to Air Compressor - C0:98:E5:70:00::90
33 3 Ken Lutz
USB Microphone - mounted on BBB
34 3 Ken Lutz
35 38 Eric Allman
### BWRC Office Area
36 23 Ken Lutz
**Sensors and Gateways**
37 23 Ken Lutz
Swarmnuc1002.eecs.berkeley.edu
38 24 Ken Lutz
**BLEE**
39 23 Ken Lutz
Main seating area - C0:98:E5:30:00:A5
40 23 Ken Lutz
Conference Room , Rabaey Room - C0:98:E5:30:00:A3
41 23 Ken Lutz
Admin Office - C0:98:E5:30:00:A4
42 23 Ken Lutz
Conference Room - Brodersen room - C0:98:E5:30:00:A2
43 23 Ken Lutz
Ken's Office  - C0:98:E5:30:00:A1
44 23 Ken Lutz
Brian Office above thermostat - C0:98:E5:30:00:A0
45 1 Ken Lutz
Center of student seating area, above thermostat - C0:98:E5:30:00:37
46 24 Ken Lutz
**Blink**
47 24 Ken Lutz
  Brodersen Conference Room C0:98:E5:90:00:87
48 24 Ken Lutz
Rabaey Conference room -  C0:98:E5:30:00:94
49 23 Ken Lutz
50 23 Ken Lutz
51 2 Ken Lutz
**Operational Notes**
52 2 Ken Lutz
6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.
53 2 Ken Lutz
7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker. 
54 2 Ken Lutz
7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.
55 14 Nitesh Mor
7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway. 
56 17 Ken Lutz
7/19/16 - :BWRC BLEE, Lab Rear wall C0:98:E5:30:00:09
57 17 Ken Lutz
7/19/16 4:05 PM - 4:19PM
58 29 Ken Lutz
8/1/16 BBB004 down for maintenance 2-5pm.
59 17 Ken Lutz
60 17 Ken Lutz
Put a cover over the BLEE causing the light level to go to zero. Temp and humidity are down as well.
61 17 Ken Lutz
62 17 Ken Lutz
7/19/16 4:20PM - 4:31PM
63 17 Ken Lutz
BWRC  BLEE mid wall C0:98:E5:30:00:5D
64 17 Ken Lutz
65 2 Ken Lutz
Put a cover over BLEE in server room, mid wall. Light level goes to zero, temp goes up
66 25 Ken Lutz
Other sensors in the server room do not show similar readings
67 36 Ken Lutz
68 1 Ken Lutz
7/25/16 - Added sensors and gateway to BWRC office area. New batteries
69 1 Ken Lutz
8/8/2016 Replaced batteries in server room  and Kens office
70 1 Ken Lutz
8/8/16 Removed test powerblade from air compressor outlet strip
71 36 Ken Lutz
72 38 Eric Allman
### Cory Hall Swarm Lab and Immersion Room
73 2 Ken Lutz
**Servers and Sensors**
74 38 Eric Allman
75 38 Eric Allman
#### Immersion Room
76 11 Ken Lutz
Primary projector PowerBlade ~~C0:98:E5:70:00:2B~~ C0:98:E5:70:00:8D
77 11 Ken Lutz
Secondary projector PowerBlade C0:98:E5:70:00:8B
78 11 Ken Lutz
Speaker Camera PowerBlade C0:98:E5:70:00:8E
79 11 Ken Lutz
Audience Camera PowerBlade C0:98:E5:70:00:88
80 1 Ken Lutz
BLEE, rear camera pillar C0:98:E5:30:00:03
81 11 Ken Lutz
Front wall adjacent to screen Blink C0:98:E5:90:00:0A
82 1 Ken Lutz
UHKBBB001.eecs.berkeley.edu 128.32.33.236
83 33 Ken Lutz
84 33 Ken Lutz
Chair BLEES C0:98:E5:30:0:  {58, 5c, 5F, 7a, 7b, 74, 75, 76, 77, 78}
85 1 Ken Lutz
86 38 Eric Allman
#### Entrance Lobby
87 1 Ken Lutz
88 34 Ken Lutz
Swarm Lab Inside Entrance Lobby
89 33 Ken Lutz
Blink C0:98:E5:90:00:0B
90 1 Ken Lutz
BLEE C0:98:E5:30:00:0A
91 33 Ken Lutz
92 38 Eric Allman
#### Office 490B
93 33 Ken Lutz
UHKBBB002.eecs.berkeley.edu
94 33 Ken Lutz
95 38 Eric Allman
#### 4th floor Elevator Lobby
96 33 Ken Lutz
Blink C0:98:E5:90:00:91
97 33 Ken Lutz
SwarmBox swarmnuc1020.eecs.berkeley.edu
98 33 Ken Lutz
99 33 Ken Lutz
#### Exit Stair Door near 490
100 33 Ken Lutz
Blink C0:98:E5:90:00:19
101 11 Ken Lutz
102 2 Ken Lutz
103 2 Ken Lutz
**Operational Notes**
104 2 Ken Lutz
7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected. 
105 2 Ken Lutz
Note that accumulated energy goes to zero at this time. 
106 2 Ken Lutz
7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
107 1 Ken Lutz
7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
108 1 Ken Lutz
7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
109 1 Ken Lutz
7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM
110 20 Nitesh Mor
7/18/16 - 11:30AM BLEES installed on conference table chairs w/ new batteries
111 21 Nitesh Mor
7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway.
112 1 Ken Lutz
7/19/16: Beaglebone gateway is got powered off. Last data collected was around 4:56PM. Restarted at 10:50PM
113 1 Ken Lutz
7/20/16: Rear Camera pillar BLEE - Battery replaced 3:26PM
114 26 Ken Lutz
7/26/16 Main projector power blade failed - replaced with new unit (new MAC)
115 29 Ken Lutz
8/1/16 BBB001 down for maintenance
116 35 Ken Lutz
8/8/16 Batteries replaced in all sensors except chairs
117 2 Ken Lutz
118 38 Eric Allman
### Jacobs Hall
119 38 Eric Allman
**Gateways**
120 31 Ken Lutz
~~ML-100 - swarmnuc1005.eecs.berkeley.edu B8:AE:ED:74:09:3D was port 10D-120C-03F10-D room 120~~
121 27 Ken Lutz
BBB - uhkbbb005.eecs.berkeley.edu port 10D-332-04F17-D Room 332
122 5 Ken Lutz
BBB uhkbbb006.eecs.berkeley.edu 54:4a:16:e0:8b:a1 10D-120C-03F10-D room 120
123 19 Ken Lutz
BBB uhkbbb007.eecs.berkeley.edu  6c:ec:eb:5c:64:5b Room 10 10D-10B-02f16-D
124 19 Ken Lutz
125 38 Eric Allman
#### Room 110
126 1 Ken Lutz
**Powerblades**
127 1 Ken Lutz
c0:98:e5:70:01:13 Type A 3D printer 10026	room 110
128 1 Ken Lutz
c0:98:e5:70:01:22
129 1 Ken Lutz
c0:98:e5:70:01:23 Type A 3D printer 10047	room 110
130 1 Ken Lutz
c0:98:e5:70:01:25
131 1 Ken Lutz
c0:98:e5:70:01:26 Laser 2                                room 110C
132 1 Ken Lutz
c0:98:e5:70:01:27 Type A 3D printer 10097	room 110
133 1 Ken Lutz
c0:98:e5:70:01:29 Type A 3D printer 10213	room 110
134 19 Ken Lutz
c0:98:e5:70:00:e2 Laser 1	                                room 110C
135 19 Ken Lutz
c0:98:e5:70:00:e5 Type A 3D printer 10035	room 110
136 19 Ken Lutz
c0:98:e5:70:00:d3 Type A 3D printer 10098	room 110
137 19 Ken Lutz
c0:98:e5:70:00:d7 Type A 3D printer 10025	room 110
138 19 Ken Lutz
c0:98:e5:70:00:f7 Type A 3D printer 10038	room 110
139 19 Ken Lutz
c0:98:e5:70:00:db - Type A 3D printer 10094 room 110
140 19 Ken Lutz
c0:98:e5:70:01:31 Type A 3D printer 10034	room 110	
141 38 Eric Allman
142 38 Eric Allman
**BLEE**
143 1 Ken Lutz
c0:98:e5:30:00:57 room 110 by thermostst
144 34 Ken Lutz
c0:98:e5:30:00:55  check placement in room
145 19 Ken Lutz
146 34 Ken Lutz
147 38 Eric Allman
#### Room 332
148 19 Ken Lutz
149 19 Ken Lutz
**PowerBlades**
150 18 Ken Lutz
c0:98:e5:70:00:8a Carbon 3D printer              room 332
151 1 Ken Lutz
c0:98:e5:70:01:0c Dimension 2 (Bonnie)	room 332
152 4 Ken Lutz
c0:98:e5:70:01:2e Dimension 1 (Clyde)         room 332
153 19 Ken Lutz
154 1 Ken Lutz
**BLEE**
155 32 Ken Lutz
156 1 Ken Lutz
c0:98:e5:30:00:55 room 120
157 19 Ken Lutz
c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
158 32 Ken Lutz
c0:98:e5:30:00:51 room 332 center of room
159 32 Ken Lutz
160 4 Ken Lutz
**Blink**
161 32 Ken Lutz
c0:98:e5:90:00:85 room 332
162 19 Ken Lutz
c0:98:e5:90:00:94
163 4 Ken Lutz
c0:98:e5:90:00:87
164 19 Ken Lutz
165 38 Eric Allman
#### Room 10C
166 1 Ken Lutz
**Blink**
167 19 Ken Lutz
c0:98:e5:90:00:81 - wood shop room 10C
168 34 Ken Lutz
**BLEE**
169 34 Ken Lutz
c0:98:e5:30:00:62 room 10C Woodshop
170 4 Ken Lutz
171 4 Ken Lutz
172 2 Ken Lutz
**Operational Notes**
173 37 Ken Lutz
Sensors installed, new batteries 7/15/16
174 30 Eric Allman
175 30 Eric Allman
### Unassigned BBB Ready for deployment
176 30 Eric Allman
UHKBBB008.eecs.berkeley.edu  b0:d5:cc:83:0b:01
177 30 Eric Allman
UHKBBB009.eecs.berkeley.edu  88:c2:55:83:6c:29