Project

General

Profile

Wiki » History » Version 50

Ken Lutz, 08/26/2016 11:44 AM

1 39 Nitesh Mor
{{toc}}
2 39 Nitesh Mor
3 1 Ken Lutz
# GDP Deployment Notes
4 1 Ken Lutz
5 16 Ken Lutz
## Data users email list created
6 15 Ken Lutz
If you would like to be notified of data anomalies or changes in the sensor actuator send an email to lutz@berkeley.edu asking to be added to the email list, swarm-gdp-data-users@lists.eecs.berkeley.edu
7 15 Ken Lutz
8 38 Eric Allman
## Conventions
9 38 Eric Allman
Unless otherwise noted, the name of the corresponding logs are derived from the physical location (currently `bwrc` or `swarmlab`) and the lowercase MAC address:
10 13 Nitesh Mor
11 13 Nitesh Mor
    edu.berkeley.eecs.<location>.device.<mac-addr>
12 13 Nitesh Mor
13 1 Ken Lutz
For example, a sensor with MAC address `C0:98:E5:30:00:03` in the immersion room (which is in swarmlab) will be named `edu.berkeley.eecs.swarmlab.device.c098e5300003`
14 1 Ken Lutz
15 38 Eric Allman
## Provisioning
16 38 Eric Allman
See [[Provisioning Sensors]] for instructions on how to add new sensors.
17 38 Eric Allman
18 39 Nitesh Mor
## Configuring Gateways
19 39 Nitesh Mor
See [[Configuring Gateways]] for information about setting up gateway hosts (typically either BBBs or SwarmBoxes).
20 39 Nitesh Mor
21 38 Eric Allman
## Deployments
22 38 Eric Allman
23 38 Eric Allman
### BWRC Server Room
24 40 Nitesh Mor
25 1 Ken Lutz
**Sensors and Gateways**
26 41 Nitesh Mor
27 40 Nitesh Mor
* BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
28 40 Nitesh Mor
* Rear Wall BLEE - C0:98:E5:30:00:36 
29 40 Nitesh Mor
* Mid Wall BLEE - C0:98:E5:30:00:5D
30 40 Nitesh Mor
* Hot Aisle BLEE- C0:98:E5:30:00:54
31 40 Nitesh Mor
* Lab Rear Wall BLEE - C0:98:E5:30:00:09
32 40 Nitesh Mor
* BLINK - C0:98:E5:90:00:1E
33 40 Nitesh Mor
* Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
34 40 Nitesh Mor
* Power Blade - Utility power to Air Compressor - C0:98:E5:70:00::90
35 40 Nitesh Mor
* USB Microphone - mounted on BBB
36 23 Ken Lutz
37 23 Ken Lutz
### BWRC Office Area
38 23 Ken Lutz
39 42 Nitesh Mor
#### Sensors and Gateways
40 23 Ken Lutz
41 40 Nitesh Mor
* Swarmnuc1002.eecs.berkeley.edu
42 40 Nitesh Mor
* BLEE
43 40 Nitesh Mor
    - Main seating area - C0:98:E5:30:00:A5
44 40 Nitesh Mor
    - Conference Room , Rabaey Room - C0:98:E5:30:00:A3
45 40 Nitesh Mor
    - Admin Office - C0:98:E5:30:00:A4
46 40 Nitesh Mor
    - Conference Room - Brodersen room - C0:98:E5:30:00:A2
47 40 Nitesh Mor
    - Ken's Office  - C0:98:E5:30:00:A1
48 40 Nitesh Mor
    - Brian Office above thermostat - C0:98:E5:30:00:A0
49 40 Nitesh Mor
    - Center of student seating area, above thermostat - C0:98:E5:30:00:37
50 40 Nitesh Mor
* Blink
51 40 Nitesh Mor
    - Brodersen Conference Room C0:98:E5:90:00:87
52 40 Nitesh Mor
    - Rabaey Conference room -  C0:98:E5:30:00:94
53 17 Ken Lutz
54 29 Ken Lutz
55 40 Nitesh Mor
**Operational Notes**
56 17 Ken Lutz
57 40 Nitesh Mor
* 6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.
58 40 Nitesh Mor
* 7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker. 
59 40 Nitesh Mor
* 7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.
60 40 Nitesh Mor
* 7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway. 
61 40 Nitesh Mor
* 7/19/16 4:05 PM - 4:19PM: Put a cover over the Lab Rear wall BLEE causing the light level to go to zero. Temp and humidity are down as well.
62 40 Nitesh Mor
* 7/19/16 4:20PM - 4:31PM: Put a cover over BLEE in server room, mid wall. Light level goes to zero, temp goes up. Other sensors in the server room do not show similar readings
63 40 Nitesh Mor
* 7/25/16 - Added sensors and gateway to BWRC office area. New batteries
64 40 Nitesh Mor
* 8/1/16 BBB004 down for maintenance 2-5pm.
65 40 Nitesh Mor
* 8/8/2016 Replaced batteries in server room  and Kens office
66 40 Nitesh Mor
* 8/8/16 Removed test powerblade from air compressor outlet strip
67 49 Ken Lutz
* 8/26/16  9:40AM - 10:10am covered light sensor on BLEE in Ken's office - C0:98:E5:30:00:A1
68 50 Ken Lutz
8/26/16 11:42 -  Covered light sensor on BLEE Center of student seating area, above thermostat - C0:98:E5:30:00:37
69 38 Eric Allman
### Cory Hall Swarm Lab and Immersion Room
70 2 Ken Lutz
**Servers and Sensors**
71 38 Eric Allman
72 38 Eric Allman
#### Immersion Room
73 43 Nitesh Mor
74 43 Nitesh Mor
* Primary projector PowerBlade ~~C0:98:E5:70:00:2B~~ C0:98:E5:70:00:8D
75 43 Nitesh Mor
* Secondary projector PowerBlade C0:98:E5:70:00:8B
76 43 Nitesh Mor
* Speaker Camera PowerBlade C0:98:E5:70:00:8E
77 43 Nitesh Mor
* Audience Camera PowerBlade C0:98:E5:70:00:88
78 43 Nitesh Mor
* BLEE, rear camera pillar C0:98:E5:30:00:03
79 43 Nitesh Mor
* Front wall adjacent to screen Blink C0:98:E5:90:00:0A
80 43 Nitesh Mor
* UHKBBB001.eecs.berkeley.edu 128.32.33.236
81 33 Ken Lutz
82 33 Ken Lutz
Chair BLEES C0:98:E5:30:0:  {58, 5c, 5F, 7a, 7b, 74, 75, 76, 77, 78}
83 1 Ken Lutz
84 38 Eric Allman
#### Entrance Lobby
85 1 Ken Lutz
86 44 Nitesh Mor
* Swarm Lab Inside Entrance Lobby
87 44 Nitesh Mor
* Blink C0:98:E5:90:00:0B
88 44 Nitesh Mor
* BLEE C0:98:E5:30:00:0A
89 33 Ken Lutz
90 38 Eric Allman
#### Office 490B
91 1 Ken Lutz
92 45 Nitesh Mor
* UHKBBB002.eecs.berkeley.edu
93 45 Nitesh Mor
94 1 Ken Lutz
#### 4th floor Elevator Lobby
95 1 Ken Lutz
96 45 Nitesh Mor
* Blink C0:98:E5:90:00:91
97 45 Nitesh Mor
* SwarmBox swarmnuc1020.eecs.berkeley.edu
98 45 Nitesh Mor
99 1 Ken Lutz
#### Exit Stair Door near 490
100 11 Ken Lutz
101 45 Nitesh Mor
* Blink C0:98:E5:90:00:19
102 2 Ken Lutz
103 1 Ken Lutz
**Operational Notes**
104 46 Nitesh Mor
105 45 Nitesh Mor
- 7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected. Note that accumulated energy goes to zero at this time. 
106 45 Nitesh Mor
- 7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
107 45 Nitesh Mor
- 7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
108 45 Nitesh Mor
- 7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
109 45 Nitesh Mor
- 7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM
110 45 Nitesh Mor
- 7/18/16 - 11:30AM BLEES installed on conference table chairs w/ new batteries
111 45 Nitesh Mor
- 7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway.
112 45 Nitesh Mor
- 7/19/16: Beaglebone gateway is got powered off. Last data collected was around 4:56PM. Restarted at 10:50PM
113 45 Nitesh Mor
- 7/20/16: Rear Camera pillar BLEE - Battery replaced 3:26PM
114 45 Nitesh Mor
- 7/26/16 Main projector power blade failed - replaced with new unit (new MAC)
115 45 Nitesh Mor
- 8/1/16 BBB001 down for maintenance
116 45 Nitesh Mor
- 8/8/16 Batteries replaced in all sensors except chairs
117 38 Eric Allman
118 38 Eric Allman
### Jacobs Hall
119 47 Nitesh Mor
120 1 Ken Lutz
**Gateways**
121 1 Ken Lutz
122 47 Nitesh Mor
- ~~ML-100 - swarmnuc1005.eecs.berkeley.edu B8:AE:ED:74:09:3D was port 10D-120C-03F10-D room 120~~
123 47 Nitesh Mor
- BBB - uhkbbb005.eecs.berkeley.edu port 10D-332-04F17-D Room 332
124 47 Nitesh Mor
- BBB uhkbbb006.eecs.berkeley.edu 54:4a:16:e0:8b:a1 10D-120C-03F10-D room 120
125 47 Nitesh Mor
- BBB uhkbbb007.eecs.berkeley.edu  6c:ec:eb:5c:64:5b Room 10 10D-10B-02f16-D
126 47 Nitesh Mor
127 1 Ken Lutz
#### Room 110
128 47 Nitesh Mor
129 1 Ken Lutz
**Powerblades**
130 1 Ken Lutz
131 47 Nitesh Mor
- c0:98:e5:70:01:13 Type A 3D printer 10026	room 110
132 47 Nitesh Mor
- c0:98:e5:70:01:22
133 47 Nitesh Mor
- c0:98:e5:70:01:23 Type A 3D printer 10047	room 110
134 47 Nitesh Mor
- c0:98:e5:70:01:25
135 47 Nitesh Mor
- c0:98:e5:70:01:26 Laser 2                                room 110C
136 47 Nitesh Mor
- c0:98:e5:70:01:27 Type A 3D printer 10097	room 110
137 47 Nitesh Mor
- c0:98:e5:70:01:29 Type A 3D printer 10213	room 110
138 47 Nitesh Mor
- c0:98:e5:70:00:e2 Laser 1	                                room 110C
139 47 Nitesh Mor
- c0:98:e5:70:00:e5 Type A 3D printer 10035	room 110
140 47 Nitesh Mor
- c0:98:e5:70:00:d3 Type A 3D printer 10098	room 110
141 47 Nitesh Mor
- c0:98:e5:70:00:d7 Type A 3D printer 10025	room 110
142 47 Nitesh Mor
- c0:98:e5:70:00:f7 Type A 3D printer 10038	room 110
143 47 Nitesh Mor
- c0:98:e5:70:00:db - Type A 3D printer 10094 room 110
144 47 Nitesh Mor
- c0:98:e5:70:01:31 Type A 3D printer 10034	room 110	
145 47 Nitesh Mor
146 1 Ken Lutz
**BLEE**
147 1 Ken Lutz
148 47 Nitesh Mor
- c0:98:e5:30:00:57 room 110 by thermostst
149 47 Nitesh Mor
- c0:98:e5:30:00:55  check placement in room
150 1 Ken Lutz
151 47 Nitesh Mor
152 1 Ken Lutz
#### Room 332
153 19 Ken Lutz
154 34 Ken Lutz
**PowerBlades**
155 38 Eric Allman
156 47 Nitesh Mor
- c0:98:e5:70:00:8a Carbon 3D printer              room 332
157 47 Nitesh Mor
- c0:98:e5:70:01:0c Dimension 2 (Bonnie)	room 332
158 47 Nitesh Mor
- c0:98:e5:70:01:2e Dimension 1 (Clyde)         room 332
159 47 Nitesh Mor
160 4 Ken Lutz
**BLEE**
161 19 Ken Lutz
162 47 Nitesh Mor
- c0:98:e5:30:00:55 room 120
163 47 Nitesh Mor
- c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
164 47 Nitesh Mor
- c0:98:e5:30:00:51 room 332 center of room
165 19 Ken Lutz
166 32 Ken Lutz
**Blink**
167 32 Ken Lutz
168 47 Nitesh Mor
- c0:98:e5:90:00:85 room 332
169 47 Nitesh Mor
- c0:98:e5:90:00:94
170 47 Nitesh Mor
- c0:98:e5:90:00:87
171 47 Nitesh Mor
172 19 Ken Lutz
#### Room 10C
173 38 Eric Allman
**Blink**
174 47 Nitesh Mor
175 47 Nitesh Mor
- c0:98:e5:90:00:81 - wood shop room 10C
176 47 Nitesh Mor
177 34 Ken Lutz
**BLEE**
178 4 Ken Lutz
179 47 Nitesh Mor
- c0:98:e5:30:00:62 room 10C Woodshop
180 2 Ken Lutz
181 47 Nitesh Mor
182 30 Eric Allman
**Operational Notes**
183 47 Nitesh Mor
184 47 Nitesh Mor
- Sensors installed, new batteries 7/15/16
185 30 Eric Allman
186 1 Ken Lutz
### Unassigned BBB Ready for deployment
187 1 Ken Lutz
UHKBBB008.eecs.berkeley.edu  b0:d5:cc:83:0b:01
188 1 Ken Lutz
UHKBBB009.eecs.berkeley.edu  88:c2:55:83:6c:29