Project

General

Profile

Wiki » History » Version 53

Syed Hasnain, 09/09/2016 01:32 PM

1 39 Nitesh Mor
{{toc}}
2 39 Nitesh Mor
3 1 Ken Lutz
# GDP Deployment Notes
4 1 Ken Lutz
5 16 Ken Lutz
## Data users email list created
6 15 Ken Lutz
If you would like to be notified of data anomalies or changes in the sensor actuator send an email to lutz@berkeley.edu asking to be added to the email list, swarm-gdp-data-users@lists.eecs.berkeley.edu
7 15 Ken Lutz
8 38 Eric Allman
## Conventions
9 38 Eric Allman
Unless otherwise noted, the name of the corresponding logs are derived from the physical location (currently `bwrc` or `swarmlab`) and the lowercase MAC address:
10 13 Nitesh Mor
11 13 Nitesh Mor
    edu.berkeley.eecs.<location>.device.<mac-addr>
12 13 Nitesh Mor
13 1 Ken Lutz
For example, a sensor with MAC address `C0:98:E5:30:00:03` in the immersion room (which is in swarmlab) will be named `edu.berkeley.eecs.swarmlab.device.c098e5300003`
14 1 Ken Lutz
15 38 Eric Allman
## Provisioning
16 38 Eric Allman
See [[Provisioning Sensors]] for instructions on how to add new sensors.
17 38 Eric Allman
18 39 Nitesh Mor
## Configuring Gateways
19 39 Nitesh Mor
See [[Configuring Gateways]] for information about setting up gateway hosts (typically either BBBs or SwarmBoxes).
20 39 Nitesh Mor
21 38 Eric Allman
## Deployments
22 38 Eric Allman
23 38 Eric Allman
### BWRC Server Room
24 40 Nitesh Mor
25 1 Ken Lutz
**Sensors and Gateways**
26 41 Nitesh Mor
27 40 Nitesh Mor
* BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
28 40 Nitesh Mor
* Rear Wall BLEE - C0:98:E5:30:00:36 
29 40 Nitesh Mor
* Mid Wall BLEE - C0:98:E5:30:00:5D
30 40 Nitesh Mor
* Hot Aisle BLEE- C0:98:E5:30:00:54
31 40 Nitesh Mor
* Lab Rear Wall BLEE - C0:98:E5:30:00:09
32 40 Nitesh Mor
* BLINK - C0:98:E5:90:00:1E
33 40 Nitesh Mor
* Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
34 40 Nitesh Mor
* Power Blade - Utility power to Air Compressor - C0:98:E5:70:00::90
35 40 Nitesh Mor
* USB Microphone - mounted on BBB
36 23 Ken Lutz
37 23 Ken Lutz
### BWRC Office Area
38 23 Ken Lutz
39 42 Nitesh Mor
#### Sensors and Gateways
40 23 Ken Lutz
41 40 Nitesh Mor
* Swarmnuc1002.eecs.berkeley.edu
42 40 Nitesh Mor
* BLEE
43 40 Nitesh Mor
    - Main seating area - C0:98:E5:30:00:A5
44 40 Nitesh Mor
    - Conference Room , Rabaey Room - C0:98:E5:30:00:A3
45 40 Nitesh Mor
    - Admin Office - C0:98:E5:30:00:A4
46 40 Nitesh Mor
    - Conference Room - Brodersen room - C0:98:E5:30:00:A2
47 40 Nitesh Mor
    - Ken's Office  - C0:98:E5:30:00:A1
48 40 Nitesh Mor
    - Brian Office above thermostat - C0:98:E5:30:00:A0
49 40 Nitesh Mor
    - Center of student seating area, above thermostat - C0:98:E5:30:00:37
50 40 Nitesh Mor
* Blink
51 40 Nitesh Mor
    - Brodersen Conference Room C0:98:E5:90:00:87
52 40 Nitesh Mor
    - Rabaey Conference room -  C0:98:E5:30:00:94
53 17 Ken Lutz
54 29 Ken Lutz
55 40 Nitesh Mor
**Operational Notes**
56 17 Ken Lutz
57 40 Nitesh Mor
* 6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.
58 40 Nitesh Mor
* 7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker. 
59 40 Nitesh Mor
* 7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.
60 40 Nitesh Mor
* 7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway. 
61 40 Nitesh Mor
* 7/19/16 4:05 PM - 4:19PM: Put a cover over the Lab Rear wall BLEE causing the light level to go to zero. Temp and humidity are down as well.
62 40 Nitesh Mor
* 7/19/16 4:20PM - 4:31PM: Put a cover over BLEE in server room, mid wall. Light level goes to zero, temp goes up. Other sensors in the server room do not show similar readings
63 40 Nitesh Mor
* 7/25/16 - Added sensors and gateway to BWRC office area. New batteries
64 40 Nitesh Mor
* 8/1/16 BBB004 down for maintenance 2-5pm.
65 40 Nitesh Mor
* 8/8/2016 Replaced batteries in server room  and Kens office
66 40 Nitesh Mor
* 8/8/16 Removed test powerblade from air compressor outlet strip
67 49 Ken Lutz
* 8/26/16  9:40AM - 10:10am covered light sensor on BLEE in Ken's office - C0:98:E5:30:00:A1
68 52 Ken Lutz
* 8/26/16 11:42 -  Covered light sensor on BLEE Center of student seating area, above thermostat - C0:98:E5:30:00:37
69 52 Ken Lutz
* 8/26/16 12:30 -12:45 (approx) increased humidity on BLEE Brian Office above thermostat - C0:98:E5:30:00:A0
70 52 Ken Lutz
* 8/26/16 2:41-2:47pm increased humidity on  Rear Wall BLEE - C0:98:E5:30:00:36 
71 51 Ken Lutz
72 38 Eric Allman
### Cory Hall Swarm Lab and Immersion Room
73 2 Ken Lutz
**Servers and Sensors**
74 38 Eric Allman
75 38 Eric Allman
#### Immersion Room
76 43 Nitesh Mor
77 43 Nitesh Mor
* Primary projector PowerBlade ~~C0:98:E5:70:00:2B~~ C0:98:E5:70:00:8D
78 43 Nitesh Mor
* Secondary projector PowerBlade C0:98:E5:70:00:8B
79 43 Nitesh Mor
* Speaker Camera PowerBlade C0:98:E5:70:00:8E
80 43 Nitesh Mor
* Audience Camera PowerBlade C0:98:E5:70:00:88
81 43 Nitesh Mor
* BLEE, rear camera pillar C0:98:E5:30:00:03
82 43 Nitesh Mor
* Front wall adjacent to screen Blink C0:98:E5:90:00:0A
83 43 Nitesh Mor
* UHKBBB001.eecs.berkeley.edu 128.32.33.236
84 33 Ken Lutz
85 33 Ken Lutz
Chair BLEES C0:98:E5:30:0:  {58, 5c, 5F, 7a, 7b, 74, 75, 76, 77, 78}
86 1 Ken Lutz
87 38 Eric Allman
#### Entrance Lobby
88 1 Ken Lutz
89 44 Nitesh Mor
* Swarm Lab Inside Entrance Lobby
90 44 Nitesh Mor
* Blink C0:98:E5:90:00:0B
91 44 Nitesh Mor
* BLEE C0:98:E5:30:00:0A
92 33 Ken Lutz
93 38 Eric Allman
#### Office 490B
94 1 Ken Lutz
95 45 Nitesh Mor
* UHKBBB002.eecs.berkeley.edu
96 45 Nitesh Mor
97 1 Ken Lutz
#### 4th floor Elevator Lobby
98 1 Ken Lutz
99 45 Nitesh Mor
* Blink C0:98:E5:90:00:91
100 45 Nitesh Mor
* SwarmBox swarmnuc1020.eecs.berkeley.edu
101 45 Nitesh Mor
102 1 Ken Lutz
#### Exit Stair Door near 490
103 11 Ken Lutz
104 45 Nitesh Mor
* Blink C0:98:E5:90:00:19
105 2 Ken Lutz
106 1 Ken Lutz
**Operational Notes**
107 46 Nitesh Mor
108 45 Nitesh Mor
- 7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected. Note that accumulated energy goes to zero at this time. 
109 45 Nitesh Mor
- 7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
110 45 Nitesh Mor
- 7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
111 45 Nitesh Mor
- 7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
112 45 Nitesh Mor
- 7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM
113 45 Nitesh Mor
- 7/18/16 - 11:30AM BLEES installed on conference table chairs w/ new batteries
114 45 Nitesh Mor
- 7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway.
115 45 Nitesh Mor
- 7/19/16: Beaglebone gateway is got powered off. Last data collected was around 4:56PM. Restarted at 10:50PM
116 45 Nitesh Mor
- 7/20/16: Rear Camera pillar BLEE - Battery replaced 3:26PM
117 45 Nitesh Mor
- 7/26/16 Main projector power blade failed - replaced with new unit (new MAC)
118 45 Nitesh Mor
- 8/1/16 BBB001 down for maintenance
119 45 Nitesh Mor
- 8/8/16 Batteries replaced in all sensors except chairs
120 38 Eric Allman
121 38 Eric Allman
### Jacobs Hall
122 47 Nitesh Mor
123 1 Ken Lutz
**Gateways**
124 1 Ken Lutz
125 47 Nitesh Mor
- ~~ML-100 - swarmnuc1005.eecs.berkeley.edu B8:AE:ED:74:09:3D was port 10D-120C-03F10-D room 120~~
126 47 Nitesh Mor
- BBB - uhkbbb005.eecs.berkeley.edu port 10D-332-04F17-D Room 332
127 47 Nitesh Mor
- BBB uhkbbb006.eecs.berkeley.edu 54:4a:16:e0:8b:a1 10D-120C-03F10-D room 120
128 47 Nitesh Mor
- BBB uhkbbb007.eecs.berkeley.edu  6c:ec:eb:5c:64:5b Room 10 10D-10B-02f16-D
129 47 Nitesh Mor
130 1 Ken Lutz
#### Room 110
131 47 Nitesh Mor
132 1 Ken Lutz
**Powerblades**
133 1 Ken Lutz
134 47 Nitesh Mor
- c0:98:e5:70:01:13 Type A 3D printer 10026	room 110
135 47 Nitesh Mor
- c0:98:e5:70:01:22
136 47 Nitesh Mor
- c0:98:e5:70:01:23 Type A 3D printer 10047	room 110
137 47 Nitesh Mor
- c0:98:e5:70:01:25
138 47 Nitesh Mor
- c0:98:e5:70:01:26 Laser 2                                room 110C
139 47 Nitesh Mor
- c0:98:e5:70:01:27 Type A 3D printer 10097	room 110
140 47 Nitesh Mor
- c0:98:e5:70:01:29 Type A 3D printer 10213	room 110
141 47 Nitesh Mor
- c0:98:e5:70:00:e2 Laser 1	                                room 110C
142 47 Nitesh Mor
- c0:98:e5:70:00:e5 Type A 3D printer 10035	room 110
143 47 Nitesh Mor
- c0:98:e5:70:00:d3 Type A 3D printer 10098	room 110
144 47 Nitesh Mor
- c0:98:e5:70:00:d7 Type A 3D printer 10025	room 110
145 47 Nitesh Mor
- c0:98:e5:70:00:f7 Type A 3D printer 10038	room 110
146 47 Nitesh Mor
- c0:98:e5:70:00:db - Type A 3D printer 10094 room 110
147 47 Nitesh Mor
- c0:98:e5:70:01:31 Type A 3D printer 10034	room 110	
148 47 Nitesh Mor
149 1 Ken Lutz
**BLEE**
150 1 Ken Lutz
151 47 Nitesh Mor
- c0:98:e5:30:00:57 room 110 by thermostst
152 47 Nitesh Mor
- c0:98:e5:30:00:55  check placement in room
153 1 Ken Lutz
154 47 Nitesh Mor
155 1 Ken Lutz
#### Room 332
156 19 Ken Lutz
157 34 Ken Lutz
**PowerBlades**
158 38 Eric Allman
159 47 Nitesh Mor
- c0:98:e5:70:00:8a Carbon 3D printer              room 332
160 47 Nitesh Mor
- c0:98:e5:70:01:0c Dimension 2 (Bonnie)	room 332
161 47 Nitesh Mor
- c0:98:e5:70:01:2e Dimension 1 (Clyde)         room 332
162 47 Nitesh Mor
163 4 Ken Lutz
**BLEE**
164 19 Ken Lutz
165 47 Nitesh Mor
- c0:98:e5:30:00:55 room 120
166 47 Nitesh Mor
- c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
167 47 Nitesh Mor
- c0:98:e5:30:00:51 room 332 center of room
168 19 Ken Lutz
169 32 Ken Lutz
**Blink**
170 32 Ken Lutz
171 47 Nitesh Mor
- c0:98:e5:90:00:85 room 332
172 47 Nitesh Mor
- c0:98:e5:90:00:94
173 47 Nitesh Mor
- c0:98:e5:90:00:87
174 47 Nitesh Mor
175 19 Ken Lutz
#### Room 10C
176 38 Eric Allman
**Blink**
177 47 Nitesh Mor
178 47 Nitesh Mor
- c0:98:e5:90:00:81 - wood shop room 10C
179 47 Nitesh Mor
180 34 Ken Lutz
**BLEE**
181 4 Ken Lutz
182 47 Nitesh Mor
- c0:98:e5:30:00:62 room 10C Woodshop
183 2 Ken Lutz
184 47 Nitesh Mor
185 30 Eric Allman
**Operational Notes**
186 47 Nitesh Mor
187 47 Nitesh Mor
- Sensors installed, new batteries 7/15/16
188 30 Eric Allman
189 53 Syed Hasnain
## TAMU
190 53 Syed Hasnain
edu.esp.tamu.Setup1c.device.*
191 53 Syed Hasnain
192 53 Syed Hasnain
**BLEE**
193 53 Syed Hasnain
c098e530001d
194 53 Syed Hasnain
195 53 Syed Hasnain
**Blink**
196 53 Syed Hasnain
c098e590010
197 53 Syed Hasnain
c098e590011
198 53 Syed Hasnain
c098e590012
199 53 Syed Hasnain
c098e5900ac
200 53 Syed Hasnain
201 53 Syed Hasnain
**PowerBlade**
202 53 Syed Hasnain
c098e5700028
203 53 Syed Hasnain
c098e57000c4
204 53 Syed Hasnain
c098e57000a8
205 53 Syed Hasnain
206 53 Syed Hasnain
**Notes**
207 53 Syed Hasnain
The sensors have been places in graduate office space. The power blades are connected to power cords in use by students.
208 53 Syed Hasnain
209 1 Ken Lutz
### Unassigned BBB Ready for deployment
210 1 Ken Lutz
UHKBBB008.eecs.berkeley.edu  b0:d5:cc:83:0b:01
211 1 Ken Lutz
UHKBBB009.eecs.berkeley.edu  88:c2:55:83:6c:29