# GDP Deployment Notes
4 1 Ken Lutz
5 16 Ken Lutz
## Data users email list created
6 15 Ken Lutz
If you would like to be notified of data anomalies or changes in the sensor actuator send an email to lutz@berkeley.edu asking to be added to the email list, swarm-gdp-data-users@lists.eecs.berkeley.edu
7 15 Ken Lutz
8 38 Eric Allman
## Conventions
9 38 Eric Allman
Unless otherwise noted, the name of the corresponding logs are derived from the physical location (currently `bwrc` or `swarmlab`) and the lowercase MAC address:
10 13 Nitesh Mor
11 13 Nitesh Mor
    edu.berkeley.eecs.<location>.device.<mac-addr>
12 13 Nitesh Mor
13 1 Ken Lutz
For example, a sensor with MAC address `C0:98:E5:30:00:03` in the immersion room (which is in swarmlab) will be named `edu.berkeley.eecs.swarmlab.device.c098e5300003`
14 1 Ken Lutz
15 38 Eric Allman
## Provisioning
16 38 Eric Allman
See [[Provisioning Sensors]] for instructions on how to add new sensors.
17 38 Eric Allman
18 39 Nitesh Mor
## Configuring Gateways
19 39 Nitesh Mor
See [[Configuring Gateways]] for information about setting up gateway hosts (typically either BBBs or SwarmBoxes).
20 39 Nitesh Mor
21 57 Nitesh Mor
## Visualization
22 57 Nitesh Mor
A minimal visualization tool is [Here](http://gdp.cs.berkeley.edu:8888/). Note that the list of sensors is manually updated for the moment, so it may not show all the sensors listed below.
23 57 Nitesh Mor
24 38 Eric Allman
## Deployments
25 38 Eric Allman
26 38 Eric Allman
### BWRC Server Room
27 40 Nitesh Mor
28 1 Ken Lutz
**Sensors and Gateways**
29 41 Nitesh Mor
30 40 Nitesh Mor
* BBB - UHKBBB004.eecs.berkeley.edu 128.32.63.176
31 40 Nitesh Mor
* Rear Wall BLEE - C0:98:E5:30:00:36 
32 40 Nitesh Mor
* Mid Wall BLEE - C0:98:E5:30:00:5D
33 40 Nitesh Mor
* Hot Aisle BLEE- C0:98:E5:30:00:54
34 40 Nitesh Mor
* Lab Rear Wall BLEE - C0:98:E5:30:00:09
35 40 Nitesh Mor
* BLINK - C0:98:E5:90:00:1E
36 40 Nitesh Mor
* Power Blade - Utility power to sump pump - C0:98:E5:70:00:8F
37 40 Nitesh Mor
* Power Blade - Utility power to Air Compressor - C0:98:E5:70:00::90
38 40 Nitesh Mor
* USB Microphone - mounted on BBB
39 23 Ken Lutz
40 23 Ken Lutz
### BWRC Office Area
41 23 Ken Lutz
42 42 Nitesh Mor
#### Sensors and Gateways
43 23 Ken Lutz
44 40 Nitesh Mor
* Swarmnuc1002.eecs.berkeley.edu
45 40 Nitesh Mor
* BLEE
46 40 Nitesh Mor
    - Main seating area - C0:98:E5:30:00:A5
47 40 Nitesh Mor
    - Conference Room , Rabaey Room - C0:98:E5:30:00:A3
48 40 Nitesh Mor
    - Admin Office - C0:98:E5:30:00:A4
49 40 Nitesh Mor
    - Conference Room - Brodersen room - C0:98:E5:30:00:A2
50 40 Nitesh Mor
    - Ken's Office  - C0:98:E5:30:00:A1
51 40 Nitesh Mor
    - Brian Office above thermostat - C0:98:E5:30:00:A0
52 40 Nitesh Mor
    - Center of student seating area, above thermostat - C0:98:E5:30:00:37
53 40 Nitesh Mor
* Blink
54 40 Nitesh Mor
    - Brodersen Conference Room C0:98:E5:90:00:87
55 40 Nitesh Mor
    - Rabaey Conference room -  C0:98:E5:30:00:94
56 17 Ken Lutz
57 29 Ken Lutz
58 40 Nitesh Mor
**Operational Notes**
59 17 Ken Lutz
60 40 Nitesh Mor
* 6-17-16 2:59PM Repaired broken Blink in server room. Was reading all zero, now detecting movement correctly.
61 40 Nitesh Mor
* 7/11/16 Fixed powerblade on air compressor - was installed backward. Data collected after 7/11 looks correct. Prior was in error. Note that energy accumulated goes to zero when powerblade was disconnected for inspection. Good marker. 
62 40 Nitesh Mor
* 7/14/16 9:29AM Correlated spike in temperature and humidity for a short period of time across all BLEES in the server room. Probably related to someone working in the room and having propped the door open.
63 40 Nitesh Mor
* 7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway. 
64 40 Nitesh Mor
* 7/19/16 4:05 PM - 4:19PM: Put a cover over the Lab Rear wall BLEE causing the light level to go to zero. Temp and humidity are down as well.
65 40 Nitesh Mor
* 7/19/16 4:20PM - 4:31PM: Put a cover over BLEE in server room, mid wall. Light level goes to zero, temp goes up. Other sensors in the server room do not show similar readings
66 40 Nitesh Mor
* 7/25/16 - Added sensors and gateway to BWRC office area. New batteries
67 40 Nitesh Mor
* 8/1/16 BBB004 down for maintenance 2-5pm.
68 40 Nitesh Mor
* 8/8/2016 Replaced batteries in server room  and Kens office
69 40 Nitesh Mor
* 8/8/16 Removed test powerblade from air compressor outlet strip
70 49 Ken Lutz
* 8/26/16  9:40AM - 10:10am covered light sensor on BLEE in Ken's office - C0:98:E5:30:00:A1
71 52 Ken Lutz
* 8/26/16 11:42 -  Covered light sensor on BLEE Center of student seating area, above thermostat - C0:98:E5:30:00:37
72 52 Ken Lutz
* 8/26/16 12:30 -12:45 (approx) increased humidity on BLEE Brian Office above thermostat - C0:98:E5:30:00:A0
73 52 Ken Lutz
* 8/26/16 2:41-2:47pm increased humidity on  Rear Wall BLEE - C0:98:E5:30:00:36 
74 59 Ken Lutz
* 9/16/16 11:41AM Replaced batteries in server room,  Kens office, student area+
75 51 Ken Lutz
76 38 Eric Allman
### Cory Hall Swarm Lab and Immersion Room
77 2 Ken Lutz
**Servers and Sensors**
78 38 Eric Allman
79 38 Eric Allman
#### Immersion Room
80 43 Nitesh Mor
81 43 Nitesh Mor
* Primary projector PowerBlade ~~C0:98:E5:70:00:2B~~ C0:98:E5:70:00:8D
82 43 Nitesh Mor
* Secondary projector PowerBlade C0:98:E5:70:00:8B
83 43 Nitesh Mor
* Speaker Camera PowerBlade C0:98:E5:70:00:8E
84 43 Nitesh Mor
* Audience Camera PowerBlade C0:98:E5:70:00:88
85 43 Nitesh Mor
* BLEE, rear camera pillar C0:98:E5:30:00:03
86 43 Nitesh Mor
* Front wall adjacent to screen Blink C0:98:E5:90:00:0A
87 43 Nitesh Mor
* UHKBBB001.eecs.berkeley.edu 128.32.33.236
88 33 Ken Lutz
89 33 Ken Lutz
Chair BLEES C0:98:E5:30:0:  {58, 5c, 5F, 7a, 7b, 74, 75, 76, 77, 78}
90 1 Ken Lutz
91 38 Eric Allman
#### Entrance Lobby
92 1 Ken Lutz
93 44 Nitesh Mor
* Swarm Lab Inside Entrance Lobby
94 44 Nitesh Mor
* Blink C0:98:E5:90:00:0B
95 44 Nitesh Mor
* BLEE C0:98:E5:30:00:0A
96 33 Ken Lutz
97 38 Eric Allman
#### Office 490B
98 1 Ken Lutz
99 45 Nitesh Mor
* UHKBBB002.eecs.berkeley.edu
100 45 Nitesh Mor
101 1 Ken Lutz
#### 4th floor Elevator Lobby
102 1 Ken Lutz
103 45 Nitesh Mor
* Blink C0:98:E5:90:00:91
104 45 Nitesh Mor
* SwarmBox swarmnuc1020.eecs.berkeley.edu
105 45 Nitesh Mor
106 1 Ken Lutz
#### Exit Stair Door near 490
107 11 Ken Lutz
108 45 Nitesh Mor
* Blink C0:98:E5:90:00:19
109 2 Ken Lutz
110 1 Ken Lutz
**Operational Notes**
111 46 Nitesh Mor
112 45 Nitesh Mor
- 7/12/16 2:59PM, powerblade on Speaker camera disconnected for inspection and reconnected. Note that accumulated energy goes to zero at this time. 
113 45 Nitesh Mor
- 7/13/16 10AM, powerblade on Immersion room primary projector re-installed, now in correct orientation. Readings from 10am on look correct.
114 45 Nitesh Mor
- 7/14/16 9:22:58AM - Introduced an anomaly by heating the Immersion room BLEE located on the rear pillar with a hot air gun for about 4 min. Temperature and humidity impacted.
115 45 Nitesh Mor
- 7/14/16 9:46AM - Speaker camera was left on since 7/12 2:26pm. Turned off at 7/14 9:46AM
116 45 Nitesh Mor
- 7/15/16 - 9:40AM Primary projector powerblade seems to have a loose connection. No readings from 7/14 3:23PM until re-seated at 7/15 9:40AM
117 45 Nitesh Mor
- 7/18/16 - 11:30AM BLEES installed on conference table chairs w/ new batteries
118 45 Nitesh Mor
- 7/17/16-7/19/16: Missed about 2 days worth of data due to bug in the MQTT-gateway.
119 45 Nitesh Mor
- 7/19/16: Beaglebone gateway is got powered off. Last data collected was around 4:56PM. Restarted at 10:50PM
120 45 Nitesh Mor
- 7/20/16: Rear Camera pillar BLEE - Battery replaced 3:26PM
121 45 Nitesh Mor
- 7/26/16 Main projector power blade failed - replaced with new unit (new MAC)
122 45 Nitesh Mor
- 8/1/16 BBB001 down for maintenance
123 45 Nitesh Mor
- 8/8/16 Batteries replaced in all sensors except chairs
124 38 Eric Allman
125 38 Eric Allman
### Jacobs Hall
126 47 Nitesh Mor
127 1 Ken Lutz
**Gateways**
128 1 Ken Lutz
129 47 Nitesh Mor
- ~~ML-100 - swarmnuc1005.eecs.berkeley.edu B8:AE:ED:74:09:3D was port 10D-120C-03F10-D room 120~~
130 47 Nitesh Mor
- BBB - uhkbbb005.eecs.berkeley.edu port 10D-332-04F17-D Room 332
131 47 Nitesh Mor
- BBB uhkbbb006.eecs.berkeley.edu 54:4a:16:e0:8b:a1 10D-120C-03F10-D room 120
132 47 Nitesh Mor
- BBB uhkbbb007.eecs.berkeley.edu  6c:ec:eb:5c:64:5b Room 10 10D-10B-02f16-D
133 47 Nitesh Mor
134 1 Ken Lutz
#### Room 110
135 47 Nitesh Mor
136 1 Ken Lutz
**Powerblades**
137 1 Ken Lutz
138 47 Nitesh Mor
- c0:98:e5:70:01:13 Type A 3D printer 10026	room 110
139 47 Nitesh Mor
- c0:98:e5:70:01:22
140 47 Nitesh Mor
- c0:98:e5:70:01:23 Type A 3D printer 10047	room 110
141 47 Nitesh Mor
- c0:98:e5:70:01:25
142 47 Nitesh Mor
- c0:98:e5:70:01:26 Laser 2                                room 110C
143 47 Nitesh Mor
- c0:98:e5:70:01:27 Type A 3D printer 10097	room 110
144 47 Nitesh Mor
- c0:98:e5:70:01:29 Type A 3D printer 10213	room 110
145 47 Nitesh Mor
- c0:98:e5:70:00:e2 Laser 1	                                room 110C
146 47 Nitesh Mor
- c0:98:e5:70:00:e5 Type A 3D printer 10035	room 110
147 47 Nitesh Mor
- c0:98:e5:70:00:d3 Type A 3D printer 10098	room 110
148 47 Nitesh Mor
- c0:98:e5:70:00:d7 Type A 3D printer 10025	room 110
149 47 Nitesh Mor
- c0:98:e5:70:00:f7 Type A 3D printer 10038	room 110
150 47 Nitesh Mor
- c0:98:e5:70:00:db - Type A 3D printer 10094 room 110
151 47 Nitesh Mor
- c0:98:e5:70:01:31 Type A 3D printer 10034	room 110	
152 47 Nitesh Mor
153 1 Ken Lutz
**BLEE**
154 1 Ken Lutz
155 47 Nitesh Mor
- c0:98:e5:30:00:57 room 110 by thermostst
156 47 Nitesh Mor
- c0:98:e5:30:00:55  check placement in room
157 1 Ken Lutz
158 47 Nitesh Mor
159 1 Ken Lutz
#### Room 332
160 19 Ken Lutz
161 34 Ken Lutz
**PowerBlades**
162 38 Eric Allman
163 47 Nitesh Mor
- c0:98:e5:70:00:8a Carbon 3D printer              room 332
164 47 Nitesh Mor
- c0:98:e5:70:01:0c Dimension 2 (Bonnie)	room 332
165 47 Nitesh Mor
- c0:98:e5:70:01:2e Dimension 1 (Clyde)         room 332
166 47 Nitesh Mor
167 4 Ken Lutz
**BLEE**
168 19 Ken Lutz
169 47 Nitesh Mor
- c0:98:e5:30:00:55 room 120
170 47 Nitesh Mor
- c0:98:e5:30:00:50 room 332 Fortus 380 air exhaust vent
171 47 Nitesh Mor
- c0:98:e5:30:00:51 room 332 center of room
172 19 Ken Lutz
173 32 Ken Lutz
**Blink**
174 32 Ken Lutz
175 47 Nitesh Mor
- c0:98:e5:90:00:85 room 332
176 47 Nitesh Mor
- c0:98:e5:90:00:94
177 47 Nitesh Mor
- c0:98:e5:90:00:87
178 47 Nitesh Mor
179 19 Ken Lutz
#### Room 10C
180 38 Eric Allman
**Blink**
181 47 Nitesh Mor
182 47 Nitesh Mor
- c0:98:e5:90:00:81 - wood shop room 10C
183 47 Nitesh Mor
184 34 Ken Lutz
**BLEE**
185 4 Ken Lutz
186 47 Nitesh Mor
- c0:98:e5:30:00:62 room 10C Woodshop
187 2 Ken Lutz
188 47 Nitesh Mor
189 30 Eric Allman
**Operational Notes**
190 47 Nitesh Mor
191 47 Nitesh Mor
- Sensors installed, new batteries 7/15/16
192 30 Eric Allman
193 58 Eric Allman
### TAMU
194 54 Syed Hasnain
edu.tamu.esp.Setup1c.device.*
195 53 Syed Hasnain
196 53 Syed Hasnain
**BLEE**
197 53 Syed Hasnain
c098e530001d
198 53 Syed Hasnain
199 53 Syed Hasnain
**Blink**
200 53 Syed Hasnain
c098e590010
201 53 Syed Hasnain
c098e590011
202 53 Syed Hasnain
c098e590012
203 53 Syed Hasnain
c098e5900ac
204 53 Syed Hasnain
205 53 Syed Hasnain
**PowerBlade**
206 53 Syed Hasnain
c098e5700028
207 53 Syed Hasnain
c098e57000c4
208 53 Syed Hasnain
c098e57000a8
209 53 Syed Hasnain
210 55 Syed Hasnain
211 55 Syed Hasnain
There is also a Motion sensors placed on door. The format is JSON and provides three axis accelrometer, gyroscope, mangnometer and time stamp. The log for the sensor is:
212 55 Syed Hasnain
213 55 Syed Hasnain
edu.esp.Tamu.device.MotionNetBKP
214 55 Syed Hasnain
215 53 Syed Hasnain
**Notes**
216 56 Syed Hasnain
The sensors have been placed in the graduate office space. The power blades are connected to power cords in use by students.
217 53 Syed Hasnain
218 1 Ken Lutz
### Unassigned BBB Ready for deployment
219 1 Ken Lutz
UHKBBB008.eecs.berkeley.edu  b0:d5:cc:83:0b:01
220 1 Ken Lutz
UHKBBB009.eecs.berkeley.edu  88:c2:55:83:6c:29